Items Similar to "Leader 3" Bronze Sculpture 26" x 9.5" x 7.5" inch Edition 3/8 by Huang Yulong
Want more images or videos?
Request additional images or videos from the seller
1 of 6
Huang Yulong"Leader 3" Bronze Sculpture 26" x 9.5" x 7.5" inch Edition 3/8 by Huang Yulong2010
2010
About the Item
"Leader 3" Bronze Sculpture 26" x 9.5" x 7.5" inch Edition 3/8 by Huang Yulong
ABOUT THE ARTIST
Huang Yulong was born in 1983 in Anhui Province, China. In 2007 he graduated with a Bachelor of Fine Arts in Sculpture from the Jingdezhen Ceramic Institute in Jiangxi Province. As one of the new generation of Chinese artists and part of the ‘post-80s generation’ and ‘only child’ generation, Huang is strongly influenced by the phenomenon of foreign culture in China, which he combines with his fascination with pottery and the material world. Huang is best known for his sculptures of Buddhas in hoodies, displaying an exchange of Eastern tradition and Western contemporary style. He was selected by “Complex” as “25 Contemporary Chinese Artists You Need to Know” in 2013. His sculptures have been exhibited at Niubi Newbie Kids II, at Schoeni Gallery, Hong Kong; “Zeitgeist” Huang Yulong’s Solo Exhibition at Himalayas Art Museum, Shanghai, China; Chinese Artist / Marseille Artist at Marseilles, France; The 4th International Contemporary Art Exhibition at Gwangju Biennale Korea, Art Beijing Art Fair at Beijing, China and etc. He also held his first solo exhibition “NULL” in Hong Kong in 2015.
- Creator:Huang Yulong (1983)
- Creation Year:2010
- Dimensions:Height: 26 in (66.04 cm)Width: 9.5 in (24.13 cm)Depth: 7.5 in (19.05 cm)
- Medium:
- Movement & Style:
- Period:
- Condition:
- Gallery Location:Culver City, CA
- Reference Number:1stDibs: LU108515779531
About the Seller
4.7
Gold Seller
These expertly vetted sellers are highly rated and consistently exceed customer expectations.
Established in 2016
1stDibs seller since 2018
355 sales on 1stDibs
Typical response time: <1 hour
- ShippingRetrieving quote...Ships From: Caochangdi, China
- Return PolicyA return for this item may be initiated within 7 days of delivery.
More From This SellerView All
- "SHURA" Bronze Sculpture 7" x 4" inch by Grigorii GorkovenkoBy Grigorii GorkovenkoLocated in Culver City, CA"SHURA" Bronze Sculpture 7" x 4" inch by Grigorii Gorkovenko An elegant shape and free lines are combined together to create an image of the Russi...Category
21st Century and Contemporary Contemporary Figurative Sculptures
MaterialsBronze
- "Be My Side L 300" Bronze & Aluminum sculpture Edition 3/6 by Huang YulongBy Huang YulongLocated in Culver City, CA"Be My Side L 300" Bronze & Aluminum sculpture Edition 3/6 by Huang Yulong ABOUT THE ARTIST Huang Yulong was born in 1983 in Anhui Province, China. In 2007 he graduated with a Bach...Category
21st Century and Contemporary Contemporary Figurative Sculptures
MaterialsMetal, Bronze
- "Lion" (PAIR) Bronze Sculpture 21" x 11" x 12" Edition 1/10 by Huang YulongBy Huang YulongLocated in Culver City, CA"Lion" (PAIR) Bronze Sculpture 21" x 11" x 12" Edition 1/10 by Huang Yulong ABOUT THE ARTIST Huang Yulong was born in 1983 in Anhui Province, China. In 2007 he graduated with a Bac...Category
21st Century and Contemporary Contemporary Figurative Sculptures
MaterialsBronze
- "Existence" Bronze sculpture 35" x 22" x 15" inch Edition 4/8 by Huang YulongBy Huang YulongLocated in Culver City, CA"Existence" Bronze sculpture 35" x 22" x 15" inch Edition 4/8 by Huang Yulong 35 2/5 × 21 7/10 × 15 in 90 × 55 × 38 cm ABOUT THE ARTIST Huang Yulong was born in 1983 in Anhui Prov...Category
21st Century and Contemporary Contemporary Figurative Sculptures
MaterialsBronze
- "Back" Bronze sculpture 79" x 79" x 31" inch Edition 4/8 by Huang YulongBy Huang YulongLocated in Culver City, CA"Back" Bronze sculpture 79" x 79" x 31" inch Edition 4/8 by Huang Yulong ABOUT THE ARTIST Huang Yulong was born in 1983 in Anhui Province, China. In 2007 he graduated with a Bachelo...Category
21st Century and Contemporary Contemporary Figurative Sculptures
MaterialsBronze
- "Cover" Bronze Sculpture Edition 1/8 by Huang YulongBy Huang YulongLocated in Culver City, CA"Cover" Bronze Sculpture Edition 1/8 by Huang Yulong Figure size: 48" x 20" x 19.5" inch Stand size: 35" x 22" x 22" inch ABOUT THE ARTIST Huang Yulong was born in 1983 in Anhui P...Category
21st Century and Contemporary Contemporary Figurative Sculptures
MaterialsBronze
You May Also Like
- Vanity with Butterflies, Bronze painted in a white, limited Edition 2018By Philippe PasquaLocated in Paris, FRVanité aux Papillons "Vanity with Butterflies", bronze painted in white. Stamped and Signed on the base 2018 - Edition of 5 This one 5/8 Among Pasqua's masterpieces are the butterfly vanities...Category
21st Century and Contemporary Contemporary Figurative Sculptures
MaterialsBronze
- "Coral Skull" SculptureLocated in Denver, CODana Younger's (US based) "Coral Skull" is an original, handmade sculpture that depicts yellow, blue, and red coral emerging from a human skull. About t...Category
2010s Contemporary Figurative Sculptures
MaterialsBronze
- Small Limited Edition Bronze Sculpture "Bull Terrier 2/12"By Melani LouwrensLocated in Cape Town, ZAA small, limited edition bronze Bull Terrier sculpture. Edition 2 of 12. FREE SHIPPINGCategory
2010s Contemporary Figurative Sculptures
MaterialsBronze
- "The temple", Small Character in a Forest Circular Figurative Bronze SculptureBy Isabelle JeandotLocated in Clermont-Ferrand, Auvergne-Rhône-Alpes"Temple" is a bronze sculpture by Isabelle Jeandot. This circular sculpture depicts a small character seated on the ground, surrounded by trees. This artwork is an allegory of Mo...Category
2010s Contemporary Still-life Sculptures
MaterialsBronze
- Lovers of Chimayo by Eduardo Oropeza, Bbronze Sculpture, Couple, Edition, ChicanoBy Eduardo OropezaLocated in Santa Fe, NMLovers of Chimayo by Eduardo Oropeza, Bronze Sculpture, Couple, Edition,Chicano Lovers of Chimayo by Eduardo Oropeza, bronze sculpture, couple, edition 25 © 1993 Sculptor, painter,...Category
1990s Contemporary Still-life Sculptures
MaterialsBronze
- Listening, bronze sculpture, childs portrait, black granite base, green patinaBy Troy WilliamsLocated in Santa Fe, NMListening, bronze sculpture, childs portrait, black granite base, green patina 35 lbsCategory
2010s Contemporary Figurative Sculptures
MaterialsGranite, Bronze