Skip to main content
Want more images or videos?
Request additional images or videos from the seller
1 of 6

Huang Yulong
"Leader 3" Bronze Sculpture 26" x 9.5" x 7.5" inch Edition 3/8 by Huang Yulong

2010

$15,500
£11,804.68
€13,588.77
CA$22,212.75
A$24,303.72
CHF 12,540.65
MX$291,034.40
NOK 159,209.48
SEK 149,163.94
DKK 101,479.96

About the Item

"Leader 3" Bronze Sculpture 26" x 9.5" x 7.5" inch Edition 3/8 by Huang Yulong ABOUT THE ARTIST Huang Yulong was born in 1983 in Anhui Province, China. In 2007 he graduated with a Bachelor of Fine Arts in Sculpture from the Jingdezhen Ceramic Institute in Jiangxi Province. As one of the new generation of Chinese artists and part of the ‘post-80s generation’ and ‘only child’ generation, Huang is strongly influenced by the phenomenon of foreign culture in China, which he combines with his fascination with pottery and the material world. Huang is best known for his sculptures of Buddhas in hoodies, displaying an exchange of Eastern tradition and Western contemporary style. He was selected by “Complex” as “25 Contemporary Chinese Artists You Need to Know” in 2013. His sculptures have been exhibited at Niubi Newbie Kids II, at Schoeni Gallery, Hong Kong; “Zeitgeist” Huang Yulong’s Solo Exhibition at Himalayas Art Museum, Shanghai, China; Chinese Artist / Marseille Artist at Marseilles, France; The 4th International Contemporary Art Exhibition at Gwangju Biennale Korea, Art Beijing Art Fair at Beijing, China and etc. He also held his first solo exhibition “NULL” in Hong Kong in 2015.
  • Creator:
  • Creation Year:
    2010
  • Dimensions:
    Height: 26 in (66.04 cm)Width: 9.5 in (24.13 cm)Depth: 7.5 in (19.05 cm)
  • Medium:
  • Movement & Style:
  • Period:
  • Condition:
  • Gallery Location:
    Culver City, CA
  • Reference Number:
    1stDibs: LU108515779531

More From This Seller

View All
"Be My Size (L)" Bronze Sculpture 18" x 39" x13" in Edition 5/8 by Huang Yulong
By Huang Yulong
Located in Culver City, CA
"Be My Size (L)" Bronze Sculpture 18" x 39" x13" in Edition 5/8 by Huang Yulong "Be My Size" Bronze & Aluminum sculpture 2015 18" x 39" x 13" inch ABOUT THE ARTIST Huang Yulong w...
Category

21st Century and Contemporary Contemporary Figurative Sculptures

Materials

Metal, Bronze

"Cover" Bronze Sculpture Edition 1/8 by Huang Yulong
By Huang Yulong
Located in Culver City, CA
"Cover" Bronze Sculpture Edition 1/8 by Huang Yulong Figure size: 48" x 20" x 19.5" inch Stand size: 35" x 22" x 22" inch ABOUT THE ARTIST Huang Yulong was born in 1983 in Anhui P...
Category

21st Century and Contemporary Contemporary Figurative Sculptures

Materials

Bronze

"What's up people-UMI" Bronze Sculpture Edition 2/8 by Huang Yulong
By Huang Yulong
Located in Culver City, CA
"What's up people-UMI" Bronze Sculpture Edition 2/8 by Huang Yulong Figure size: 37" X 16.5" X 15" inch Stand size: 39" X 22" X 22" inch ABOUT THE ARTIST Huang Yulong was born in ...
Category

21st Century and Contemporary Contemporary Figurative Sculptures

Materials

Bronze

"Skulls Alphabet Nr. J" Bronze and Steel Sculpture 1/1 by Sergii Shaulis
By Sergii Shaulis
Located in Culver City, CA
"Skulls Alphabet Nr. J" Bronze and Steel Sculpture 1/1 by Sergii Shaulis 9.5" x 6" x 8'' inch Weight: 14 lbs SKULLS "ALPHABET" series: The project i...
Category

21st Century and Contemporary Contemporary Still-life Sculptures

Materials

Bronze, Stainless Steel

"Be My Side L 300" Bronze & Aluminum sculpture Edition 3/6 by Huang Yulong
By Huang Yulong
Located in Culver City, CA
"Be My Side L 300" Bronze & Aluminum sculpture Edition 3/6 by Huang Yulong ABOUT THE ARTIST Huang Yulong was born in 1983 in Anhui Province, China. In 2007 he graduated with a Bach...
Category

21st Century and Contemporary Contemporary Figurative Sculptures

Materials

Metal, Bronze

"Top Dog" Bronze Sculpture 24" x 11.5" x 12" in Edition of 33 by Huang Yulong
By Huang Yulong
Located in Culver City, CA
"Top Dog" Bronze Sculpture 24" x 11.5" x 12" in Edition of 33 by Huang Yulong ABOUT THE ARTIST Huang Yulong was born in 1983 in Anhui Province, China. In 2007 he graduated with a B...
Category

21st Century and Contemporary Contemporary Figurative Sculptures

Materials

Bronze

You May Also Like

Pear With Leaf Patinated Bronze Sculpture
By Randi Grantham
Located in Lake Worth Beach, FL
Pear with a leaf. Artist signed, patinated bronze, on black marble base 8"x8" Randi Grantham was born and raised in Las Vegas, Nevada and now lives in South Florida. He is a self ta...
Category

2010s Contemporary Still-life Sculptures

Materials

Marble, Bronze

Benaras Ghat, Bronze Sculpture, Green, Brown, Patina by Indian Artist "In Stock"
By Tushar Kanti Das Roy
Located in Kolkata, West Bengal
Tushar Kanti Das Roy - Benaras Ghat - 8 x 9 x 5 inches Bronze Sculpture Single edition About the Artist & his work : Born : 1968. Education : He has com...
Category

2010s Contemporary Still-life Sculptures

Materials

Bronze

Think Green, Two Children, Green Patina Bronze Sculpture, "In Stock"
By Subrata Biswas
Located in Kolkata, West Bengal
Subrata Biswas - Think Green - H: 13 Inches x W: 12 Inches X D: 4 Inches Bronze Sculpture. Subrata Biswas’s three sculptures ‘Think Green’, ‘Amigo’ and ‘City Bred’ a conscious selec...
Category

Early 2000s Contemporary Figurative Sculptures

Materials

Bronze

Forbidden Fruit II by Ondřej Oliva - Large bronze sculpture, apple form, golden
By Ondřej Oliva
Located in Paris, FR
Forbidden Fruit II is a bronze sculpture by contemporary Czech sculptor Ondřej Oliva, dimensions are 100 × 100 × 100 cm (39.4 × 39.4 × 39.4 in). This artwork is from a limited editio...
Category

2010s Contemporary Figurative Sculptures

Materials

Bronze

Barok by Ondřej Oliva - Figurative bronze sculpture, mysterious form, golden
By Ondřej Oliva
Located in Paris, FR
Barok is a bronze sculpture by contemporary Czech sculptor Ondřej Oliva, dimensions are 35 × 60 × 35 cm (13.8 × 23.6 × 13.8 in). This artwork is a unique piece and comes with a certi...
Category

2010s Contemporary Figurative Sculptures

Materials

Bronze

Urbanut II by Ondřej Oliva - Bronze sculpture, contrasts, figurative, organic
By Ondřej Oliva
Located in Paris, FR
Urbanut II is a bronze sculpture by contemporary Czech sculptor Ondřej Oliva, dimensions are 40 × 50 × 40 cm (15.7 × 19.7 × 15.7 in). This artwork is from a limited edition of 6, eac...
Category

2010s Contemporary Still-life Sculptures

Materials

Bronze