Skip to main content
Want more images or videos?
Request additional images or videos from the seller
1 of 7

Long Leaded Glass Window 14" x 60"

$900
£684.97
€784.48
CA$1,280.11
A$1,402.81
CHF 732.58
MX$16,857.97
NOK 9,158.50
SEK 8,637.92
DKK 5,855.28

About the Item

Long five foot leaded glass window or transom. Textured clear glass give light and privacy. Attractive leaded design with shield. Currently housed in a wooden frame - the overall dimensions are for the stained glass and the frame. Located in NY
  • Dimensions:
    Height: 60 in (152.4 cm)Width: 14 in (35.56 cm)Depth: 2 in (5.08 cm)
  • Materials and Techniques:
  • Period:
  • Date of Manufacture:
    20th Century
  • Condition:
    Wear consistent with age and use. Minor fading. Normal century old age with possible bowing, fading, small line cracks, warping, window needs to be tightened within frame.
  • Seller Location:
    Brooklyn, NY
  • Reference Number:
    Seller: 3091-1ST-NE1stDibs: LU921841435162

More From This Seller

View All
Leaded Glass Window 36" x 23"
Located in Brooklyn, NY
Antique window with beveled glass panels. Currently housed in a wooden frame - the overall dimensions are for the stained glass and the frame. Located in NY
Category

Early 20th Century Windows

Materials

Glass

Two Part Stained Glass Window 27" x 55"
Located in Brooklyn, NY
Tall window with two stained glass panels. Each piece is colored with leaded design. Currently housed in a wooden frame - the overall dimensions are for the stained glass and the fra...
Category

Early 20th Century Windows

Materials

Lead

Leaded Glass Window 27" x 28"
Located in Brooklyn, NY
Antique glass window with lightly colored glass and ornate leaded design. This stained glass window comes from a turn of the century brownstone in Brooklyn NY! Currently housed in a ...
Category

Early 20th Century Windows

Materials

Lead

Stained Glass Window 24" x 37"
Located in Brooklyn, NY
Small antique window with stained glass. Leaded trim design with textured glass. Currently housed in a wooden frame - the overall dimensions are ...
Category

Early 20th Century Windows

Materials

Stained Glass

Stained Glass Transom 44" x 18"
Located in Brooklyn, NY
Art Deco style window with stained glass patterns.The clear glass is textured to let ample sunlight in and also provide privacy. Currently housed in a wooden frame - the overall dime...
Category

Early 20th Century Windows

Materials

Stained Glass

Victorian Stained Glass Window 39" x 29"
Located in Brooklyn, NY
Stunning window with elaborate stained glass patterns. Textured glass with leaded designs, featuring a shield in the center. Currently housed in a wooden frame - the overall dimensio...
Category

Early 20th Century Windows

Materials

Stained Glass

You May Also Like

Antique Clear Leaded Glass Window with Wood Frame
Located in Doylestown, PA
Antique clear leaded glass window in wood frame, c. 1900s. Wonderful window encased in original wood frame with a clean and crisp, timeless ...
Category

Early 20th Century Mission Windows

Materials

Glass, Wood

Antique Victorian Leaded Stained Glass Neoclassical Architectural Window 47"
Located in Dayton, OH
An impressive antique Victorian Neoclassical style leaded stained glass window. Features beautiful ribboned and scrolled motif with leaded, slag, swirl and pebble glass. Features c...
Category

Antique Late 19th Century Victorian Windows

Materials

Stained Glass, Hardwood

Monumental Antique Victorian Art Nouveau Leaded Stained Glass Window French Door
Located in Dayton, OH
A rare and exceptional reclaimed large two part leaded stained glass French Door / Window. Features a large rectangular frame with two 2-part hinged doors with separate operating win...
Category

Antique Late 19th Century High Victorian Windows

Materials

Lead

Early 20th Century Antique Victorian Beveled Glass Window in Original Frame
Located in Stamford, CT
Early 20th century beveled glass transom window with amazing bevels and four jewels. This is a fantastic window from a turn of the century Victorian home in western Pennsylvania. The...
Category

Early 20th Century American Windows

Materials

Glass, Wood

Early 20th Century Stained Glass Window in a Wood Frame
Located in Stamford, CT
Beautiful Antique Early 20th Century leaded stained glass window with a Jeweled center and Fleur De Lis pattern on the top and bottom. It is in gr...
Category

Early 20th Century American Windows

Materials

Lead

Early 20th Century Antique Stained Glass Window in a Wood Frame
Located in Stamford, CT
Early 20th Century stained glass window from a Tudor style estate in Pittsburgh PA. The colors of the glass are beautiful and it has a lower window that pulls opens. This is a great ...
Category

Early 20th Century American Windows

Materials

Stained Glass, Wood